Homeowner wanted to turn a large room into a half bath for the gym area, walk in shower, large closet and toilet room. We moved the exterior door from the bathroom to the room next to it and removed the large windows that were located next to where the shower was going. Framed all walls, ran ductwork, electrical and plumbing. Installed drywall, tile, doors and trim. Installed vanities and painted.