Removed shower insert, tub, toilet and flooring. Replaced plumbing for tub for a freestanding tub and faucet, replaced shower faucet, ran new wiring for two lights above vanity, built custom pan for shower, installed shower tile and floor tile. Installed shiplap where freestanding tub will be installed. Painted new baseboards, painted walls, ceiling, trim and doors. Installed toilet, mirrors and lights. Installed frameless glass door.