Completely gutted the bathroom and moved existing lights above vanity to be centered on new vanities. Installed new faucet and niche in the shower. Tiled shower and bathroom floor. Tiled walls around where free standing tub went. Installed freestanding tub and faucet. Installed vanity, counter top and faucets. Installed baseboards and painted entire bathroom. Installed toilet.
Past Projects
- Two Bathroom remodels August 31, 2025
- Screen porch August 31, 2025
- EZE breeze windows August 31, 2025
- Front porch August 31, 2025
- Deck August 31, 2025
Job Types
- Basement Buildout (2)
- Bathroom Remodel (11)
- Composite Decking (9)
- Concrete, stone and brick work (8)
- Countertops (1)
- Covered porch (17)
- Decks (33)
- Flooring (6)
- Kitchen Remodel (1)
- Painting/Siding (6)
- Roofing (5)
- Screen Porches (14)
- Sun Rooms (6)
- Uncategorized (8)