Removed shower and tile floor. Framed wall out further to make shower larger. Installed bench and two niche. Replaced shower faucet. Tiled shower. Installed lvp flooring. Installed handicap grab bars in shower. Glass doors will be installed in two weeks once they are cut. Painted walls, ceiling, doors and trim.