Removed existing deck. leveled area under deck. Poured 33’x12’ concrete pad with a retaining wall. Built 33’x12’ deck with 10’x4’ landing. Installed Trex rain escape under decking and gutter. Ran proper drainage behind wall and from gutters. Graded back yard for proper water run off. Ran electrical and installed two fans, five outlets and one ring flood light.

Contact Us Now