by Joey Bolls | Aug 18, 2021 | Concrete, stone and brick work, Painting/Siding, Roofing, Sun Rooms
Removed existing concrete pad. Poured 20’x12’ and 12’x6’ concrete pads. Built shed roof over 20’x12’ section and framed walls for Eze breeze windows and one storm door. Ran electrical for one ceiling fan and four can lights. Installed pine tongue and groove ceiling...
by Joey Bolls | Jul 16, 2021 | Composite Decking, Concrete, stone and brick work, Decks
Poured concrete pad and retaining wall; built deck with Trex decking, Trex rails and Trex under...